ISO-690 (author-date, English)

GAO, Yuan, YUAN, Jinjiang, NG, C.T. und CHENG, T.C.E., 2019. A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan. European Journal of Operational Research. 16 Februar 2019. Vol. 273, no. 1, p. 74-81. DOI 10.1016/j.ejor.2018.07.040.

Elsevier - Harvard (with titles)

Gao, Y., Yuan, J., Ng, C., Cheng, T., 2019. A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan. European Journal of Operational Research 273, 74-81. https://doi.org/10.1016/j.ejor.2018.07.040

American Psychological Association 7th edition

Gao, Y., Yuan, J., Ng, C., & Cheng, T. (2019). A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan. European Journal of Operational Research, 273(1), 74-81. https://doi.org/10.1016/j.ejor.2018.07.040

Springer - Basic (author-date)

Gao Y, Yuan J, Ng C, Cheng T (2019) A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan.. European Journal of Operational Research 273:74-81. https://doi.org/10.1016/j.ejor.2018.07.040

Juristische Zitierweise (Stüber) (Deutsch)

Gao, Yuan/ Yuan, Jinjiang/ Ng, C.T./ Cheng, T.C.E., A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan., European Journal of Operational Research 2019, 74-81.

Bitte prüfen Sie die Zitate auf Korrektheit, bevor Sie diese in Ihre Arbeit einfügen.