Treffer: A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan.
Title:
A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan.
Authors:
Source:
European Journal of Operational Research. Feb2019, Vol. 273 Issue 1, p74-81. 8p.
Database:
Business Source Ultimate