HAN, Zhenduo, ZHANG, Biao, SANG, Hongyan, LU, Chao, MENG, Leilei und ZOU, Wenqiang, 2025. Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics. International Journal of Production Research. 1 März 2025. Vol. 63, no. 5, p. 1753-1778. DOI 10.1080/00207543.2024.2390979.
Elsevier - Harvard (with titles)Han, Z., Zhang, B., Sang, H., Lu, C., Meng, L., Zou, W., 2025. Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics. International Journal of Production Research 63, 1753-1778. https://doi.org/10.1080/00207543.2024.2390979
American Psychological Association 7th editionHan, Z., Zhang, B., Sang, H., Lu, C., Meng, L., & Zou, W. (2025). Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics. International Journal of Production Research, 63(5), 1753-1778. https://doi.org/10.1080/00207543.2024.2390979
Springer - Basic (author-date)Han Z, Zhang B, Sang H, Lu C, Meng L, Zou W (2025) Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics.. International Journal of Production Research 63:1753-1778. https://doi.org/10.1080/00207543.2024.2390979
Juristische Zitierweise (Stüber) (Deutsch)Han, Zhenduo/ Zhang, Biao/ Sang, Hongyan/ Lu, Chao/ Meng, Leilei/ Zou, Wenqiang, Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics., International Journal of Production Research 2025, 1753-1778.