LI, Zenghui, WANG, Qi, CHEN, Yan, LI, Ning, GUO, Yuchen und LIU, Yuchi, 2024. Distributed economic optimisation of multi‐energy park operation based on cloud platform architecture considering network delivery capacity. IET Renewable Power Generation (Wiley-Blackwell). 16 November 2024. Vol. 18, no. 15, p. 3149-3160. DOI 10.1049/rpg2.12877.
Elsevier - Harvard (with titles)Li, Z., Wang, Q., Chen, Y., Li, N., Guo, Y., Liu, Y., 2024. Distributed economic optimisation of multi‐energy park operation based on cloud platform architecture considering network delivery capacity. IET Renewable Power Generation (Wiley-Blackwell) 18, 3149-3160. https://doi.org/10.1049/rpg2.12877
American Psychological Association 7th editionLi, Z., Wang, Q., Chen, Y., Li, N., Guo, Y., & Liu, Y. (2024). Distributed economic optimisation of multi‐energy park operation based on cloud platform architecture considering network delivery capacity. IET Renewable Power Generation (Wiley-Blackwell), 18(15), 3149-3160. https://doi.org/10.1049/rpg2.12877
Springer - Basic (author-date)Li Z, Wang Q, Chen Y, Li N, Guo Y, Liu Y (2024) Distributed economic optimisation of multi‐energy park operation based on cloud platform architecture considering network delivery capacity.. IET Renewable Power Generation (Wiley-Blackwell) 18:3149-3160. https://doi.org/10.1049/rpg2.12877
Juristische Zitierweise (Stüber) (Deutsch)Li, Zenghui/ Wang, Qi/ Chen, Yan/ Li, Ning/ Guo, Yuchen/ Liu, Yuchi, Distributed economic optimisation of multi‐energy park operation based on cloud platform architecture considering network delivery capacity., IET Renewable Power Generation (Wiley-Blackwell) 2024, 3149-3160.